★ Modern Apartment Refresh
JVC refresh scope stayed stable because finishes were locked early and building access rules were aligned before site start.
Apartment renovation planning, kitchen and bathroom upgrades, flooring and painting, approvals support, and a free 3D preview so decisions are clear before major work starts.
Share your apartment photos and get an architect led 3D concept plus a written scope. This helps freeze kitchen and bathroom decisions early, reduce delays, and keep cost predictable.
JVC refresh scope stayed stable because finishes were locked early and building access rules were aligned before site start.
Dubai Marina kitchen and bathroom upgrades stayed smooth because waterproofing method and fixture points were confirmed before demolition.
Business Bay layout improvement focused on circulation, storage and lighting layers, with early points mapping to avoid rework.
JLT bathroom work stayed safe by using staged waterproofing and a clear testing moment before tiling and final fixtures.
Downtown Dubai full makeover stayed under control by writing scope room by room, starting approvals early, and confirming long lead items before site start.
From photo upload to architect led 3D planning, scope freeze, approvals guidance, and staged execution. The aim is simple, clarify the design first so there are no surprises on site.
Swipe tables on mobile to view details.
| What you send | Examples | Why it helps |
|---|---|---|
| Photos or short walkthrough | Living, bedrooms, kitchen, bathrooms, balcony, ceiling, closeups of issues | Speeds up 3D concept planning and reduces guesswork |
| Layout or unit plan | PDF or screenshot, if available | Helps align circulation, storage and point locations |
| Your goals and budget tier | Refresh, standard, premium, full makeover | Lets us propose a realistic scope and finish direction |
| Building rules | Work hours, lift booking, protection deposit, waste rules, NOC template | Avoids delays and neighbor complaints from day one |
| Deliverable | What it includes | Why it protects you |
|---|---|---|
| Architect prepared 3D preview | Kitchen logic, bathroom zoning, storage ideas, lighting mood, practical layout | Decisions become visible so scope stays stable |
| Revision loop | Adjustments based on your feedback | Reduces mid work changes after ordering |
| Scope freeze pack | Room by room scope, finishes shortlist, points map, execution sequence | Controls cost, timeline and reduces rework |
| Approvals guidance | NOC documents, access plan, protection plan, scheduling plan | Prevents delays caused by missing building requirements |
| Stage | What happens | Outcome |
|---|---|---|
| Stage 1 | Discovery, room list, priorities, condition checks | Scope direction becomes clear |
| Stage 2 | 3D concept by architects | Kitchen and bathroom decisions become visual |
| Stage 3 | Points alignment for power and plumbing and lighting | Prevents hidden clashes and rework |
| Stage 4 | Revisions and scope lock | Procurement becomes safe |
| Stage 5 | Approvals and NOC guidance | Site start without delays |
| Stage 6 | Procurement and scheduling | Long lead items planned early |
| Stage 7 | Execution in stages with protection and quality checks | Clean progress and stable timeline |
| Stage 8 | Snag and handover | Organized closeout and clean finish |
These questions decide budget, timeline, approvals, and stress level. The goal is clarity so execution stays smooth and you avoid rework.
Use this compare table to decide scope, timeline, approvals lane, and risk control. Swipe table to view details.
| Question | Fast answer | Why it matters | Best first step |
|---|---|---|---|
| How much does it cost | Depends on sqm and kitchen and bathroom scope | Budget slips when scope is not written | Decide scope tier then lock points map |
| How much to fully renovate | Full makeover includes kitchen, bathrooms, flooring, lighting, joinery | Full scope needs long lead planning | Confirm long lead items before demolition |
| Is it hard | Hard when decisions and approvals are late | Late changes create rework | Use 3D preview then freeze scope |
| Why projects delay | Late approvals, missing drawings, long lead items, scope creep | Delays increase cost and stress | Start NOC lane early and plan procurement |
| Do apartments appreciate | Depends on location and maintenance | Smart upgrades improve usability and perceived value | Upgrade kitchen and bathrooms with durable finishes |
| Best month to renovate | When you can manage access and decisions fast | Work hours and deliveries control speed | Confirm building rules and lift booking early |
| Latest trends | Warm neutrals, layered lighting, storage, easy clean finishes | Trends can create maintenance risk if wrong | Choose durability first then style |
| Hardest challenge | MEP points plus wet area details | Wrong points cause rework and leakage risk | Freeze points map before ordering |
Swipe table to view details. This practical safety list helps owners avoid surprises.
| Red flag | What it looks like | What can go wrong | Safe control step |
|---|---|---|---|
| Building NOC issues | NOC requirements unclear, late approvals, missing contractor documents | Delays, penalties, work stoppage, wasted deliveries | Start approvals lane early with scope summary and access plan |
| Waterproofing risk | Wet area method not written, no staged testing, rushed tiling | Leakage, neighbor complaints, rework, higher cost | Use staged waterproof steps and test before tiles |
| Scope creep | Constant changes after ordering, no room by room scope | Budget overruns, timeline slips, disputes | Freeze scope with 3D preview and a points map |
| Long lead items | Cabinets, stone, lighting, shower glass confirmed late | Idle site days, rushed installation, compromised quality | Confirm lead times and alternatives before mobilization |
| Neighbor complaint risk | Noise and dust controls not planned, waste movement messy | Complaints, restricted work hours, extra deposits | Protection plan, delivery timing, daily cleaning routine |
Swipe tables on mobile to view details.
| Service | What is included | Best for |
|---|---|---|
| Painting and wall finishing | Protection, prep, smooth finish, clean handover | Refresh scope and move out preparation |
| Flooring upgrades | Tile, vinyl, laminate options, leveling checks | Modern look plus easy cleaning |
| Ceiling and lighting | Layered lighting, false ceiling details, neat wiring | Better mood and usability |
| Joinery and storage | Wardrobes, TV units, vanities, storage solutions | Space optimization and clutter control |
| Focus area | What we plan first | Why it matters |
|---|---|---|
| Kitchen renovation | Layout logic, cabinet sizes, appliances readiness, points map | Stops late changes after ordering. Read guide Kitchen Renovation Dubai |
| Bathroom renovation | Waterproof method, slope check, tile and fitting plan | Prevents leakage risk. Read guide Bathroom Renovation Dubai |
| Plumbing and electrical corrections | Point mapping before demolition | Prevents hidden clashes and rework |
| Handover checklist | Snag list, cleaning, warranty notes | Reduces post handover complaints |
Single table you can use to judge bathroom quality and reduce leakage risk. Swipe table to view details.
| Bathroom step | Quality check | Common mistake | Best practice |
|---|---|---|---|
| Demolition and substrate | Clean base, no loose tiles, proper screed condition | Covering weak base and tiling over it | Repair base first then proceed |
| Waterproofing membrane | Correct coats, corners sealed, penetrations treated | Rushing coats and skipping corners | Follow staged method with drying time |
| Slope and drainage | Water flows to drain, no ponding | Flat slope leading to smells and seepage | Check slope before tiling |
| Testing before tiles | Controlled test window and checks | Skipping testing to save time | Test first then tile |
| Tile alignment and grout | Level, neat grout, clean joints | Uneven tiles and messy grout | Use spacing and straight lines |
| Final silicone and fittings | Neat sealing, correct installation | Gaps leading to water ingress | Finish sealing after snag check |
| Step | What you do | Result |
|---|---|---|
| Step 1 | Share photos or layout, list rooms, pick scope tier, confirm move out plan | Clear direction and realistic budget lane |
| Step 2 | Review 3D preview plus written scope | Kitchen and bathroom decisions become visual |
| Step 3 | Freeze scope and points map before ordering | Cost and timeline become stable |
| Step 4 | Approvals, NOC documents, lift booking, protection plan | Site start without forced pauses |
| Step 5 | Execution in stages, waterproof testing, snag list, clean handover | Quality finish with less stress |
Most delays are predictable when you track approvals, scope lock, procurement, and inspections as separate lanes.
| Delay cause | Why it happens | How to prevent it |
|---|---|---|
| Approvals started late | Building NOC and access steps begin after demolition planning | Collect NOC documents and confirm rules before ordering and mobilization |
| Kitchen and bathroom scope changes | Cabinets tiles and fixtures are ordered, then layout changes | Freeze design in 3D and lock points map before procurement |
| Waterproofing mistakes | Slope and membrane steps are rushed, then leakage complaints appear | Use staged waterproof method and test before tiling |
| Long lead items | Cabinets stone lighting shower glass arrive late | Confirm lead times early and choose available alternatives where needed |
| Access timing and lift booking | Work hours and delivery rules restrict manpower and deliveries | Align permits deliveries and manpower with building access windows |
| Decision area | What to check | Simple safe choice |
|---|---|---|
| Renovation timing | Building work hours, lift booking, delivery slots, your schedule | Start when you can manage access and decisions fast |
| Latest trends | Does it improve cleaning and durability or only looks | Pick durable finishes first then style |
| Apartment appreciation | Location and maintenance matter more than fancy detail | Upgrade kitchen and bathrooms with clean workmanship |
| Hardest challenge | Coordination between points and finishes | Lock points map early and avoid mid work changes |
Approximate estimates in AED. Final cost depends on apartment size, kitchen and bathroom scope, waterproofing, MEP points changes, materials, and approvals. Swipe table to view details.
| Scope level | Typical inclusions | Approx range per sqm | When it fits best |
|---|---|---|---|
| Refresh | Paint, minor repairs, basic lighting, simple flooring upgrade, small fixes | AED 450 to 850 per sqm | When the apartment is functional but looks tired |
| Standard upgrade | Flooring plus ceiling lighting plan, kitchen touch ups, one bathroom refresh | AED 850 to 1350 per sqm | When you want a clean modern look without heavy changes |
| Premium renovation | Kitchen cabinets countertop, bathrooms waterproof and tiles, joinery upgrades, better lighting | AED 1350 to 2200 per sqm | When kitchen and bathrooms are the priority |
| Full makeover | Multiple bathrooms, major kitchen, joinery, feature ceilings, wider MEP changes | AED 2200 plus per sqm | When you want a full transformation |
| Apartment type | Common scope | Indicative total range |
|---|---|---|
| Studio | Paint flooring lighting kitchen touch up | AED 18k to 60k |
| 1 bedroom | Flooring paint lighting plus kitchen or bathroom refresh | AED 35k to 120k |
| 2 bedroom | Kitchen and bathrooms scope increases | AED 60k to 220k |
| 3 bedroom | Multiple bathrooms joinery and deeper upgrades | AED 90k to 350k |
Single bathroom pricing varies by tiles, waterproofing method, fittings, and shower glass. This is an indicative snapshot.
| Bathroom scope | Typical includes | Indicative range | Notes |
|---|---|---|---|
| Refresh | Minor fixes, reseal, accessories upgrades | AED 3k to 9k | Best when base tiles are fine and no leakage signs |
| Standard renovation | Tiles, basic waterproof lane, fittings upgrade | AED 12k to 28k | Most common for older bathrooms |
| Premium renovation | Full waterproof method, tiles, better fittings, shower glass | AED 28k to 55k | Best for long term durability and premium look |
| Cost driver | What increases cost | How to control it |
|---|---|---|
| Kitchen | Cabinet size, countertop type, appliances readiness, point changes | Lock layout and points early in 3D |
| Bathrooms | Waterproofing scope, tile size, fittings quality, shower glass | Follow staged waterproof testing and keep scope written |
| Flooring | Premium materials and leveling needs | Pick durable options and confirm subfloor condition |
| MEP points | Relocating plumbing and electrical points | Use a points map before demolition |
| Approvals and access | Deposits, protection requirements, restricted hours | Start NOC lane early and align deliveries |
Swipe table to view details.
| Approval item | Who issues | Why it matters |
|---|---|---|
| Building management NOC | Building management | Required before any site start in most towers |
| Landlord or owner approval | Owner side | Needed when changes impact base items or tenancy conditions |
| Community guidelines | Community management | Extra rules for wet areas, noise, and work hours in some zones |
| Item | What to prepare | What it prevents |
|---|---|---|
| Scope freeze | Kitchen and bathroom plan, points map, finish list | Scope creep and late ordering changes |
| Documents pack | Layout, method statement, contractor details if requested | NOC delays and access issues |
| Access plan | Work hours, lift booking, protection plan, waste plan | Neighbor complaints and stoppages |
| Long lead items list | Cabinets, tiles, lights, shower glass, stone | Idle site days and timeline slips |
| Approval item | When it is needed | What usually helps |
|---|---|---|
| Building management NOC | Before site start | Scope summary, access plan, protection plan, contractor details |
| Service lift booking | Before deliveries and debris removal | Delivery schedule and manpower plan |
| Protection deposit rules | Before mobilization | Lift and corridor protection photos plus method |
| Wet area works notes | For bathrooms and kitchen plumbing | Waterproof method, testing plan, materials notes |
| After hours permits | When needed | Noise plan and timing plan |
Apartment renovation projects across major residential areas, subject to building rules and access windows.
Real words from clients. Results vary by scope and building rules, but quality method and communication stay consistent.
Got my Villa bathrooms renovated by Revive Hub, and the results are outstanding. The tiling work is absolutely top notch perfectly leveled, neat grouting, and great attention to small details. The overall finish gives a very premium look. The team was professional, on time, and kept everything clean during the renovation. Highly recommend Revive Hub for anyone looking for quality bathroom renovations in Dubai.
We had to do a structural change and the most difficult part was the approvals in Emaar. The guys did great job as my husband does not stay with me so their assistance was great. And most importantly the quality communication and timely delivery really helped us. Keep it up guys.
Want predictable cost and a smooth timeline? Start with the apartment renovation guide to understand scope, approvals, and the kitchen and bathroom risk points. Then read our Featured story that explains why Revive Hub introduced a visualize first pay later model in Dubai renovations.
Clear scope first, then execution. This is how owners reduce risk.