Book on WhatsApp Revive Hub Renovations Dubai Logo

Office Fit Out Dubai

Workspace planning, partitions, MEP and IT coordination, approvals support, and a 3D preview so the scope is clear before major work starts.

3D preview before commitment
Design revisions before start
NOC and approvals guidance
Handover checklist

First See Then Pay for office fit out

Share your office photos or layout and receive a clear 3D concept plus a practical scope. This helps freeze decisions early, reduce delays, and keep costs predictable.

Featured Office Fit Out Projects in Dubai

Business Bay Office Fit Out

Area Business Bay Scope partitions and workstations Focus NOC flow
Office fit out Dubai Business Bay video thumbnail
Click to play

A Business Bay fit out where schedule stayed stable by freezing drawings early and aligning building management NOC, work permits, and site access windows before ordering materials.

Business Bay office fit out after
Business Bay office workstations
Business Bay office partitions
Business Bay office ceiling and lighting
Business Bay office fit out after repeat

Dubai Silicon Oasis Office Renovation

Area Dubai Silicon Oasis Scope flooring and ceiling Focus fast 3D clarity
Office renovation Dubai Silicon Oasis video thumbnail
Click to play

A Silicon Oasis project where cost stayed controlled by keeping MEP changes minimal and confirming power, data points, and lighting plan before final finishes.

Dubai Silicon Oasis office renovation
Dubai Silicon Oasis office ceiling detail
Dubai Silicon Oasis office layout after
Dubai Silicon Oasis office workspace
Dubai Silicon Oasis office renovation repeat

JLT Modern Workspace Fit Out

Area Jumeirah Lake Towers Scope glass and meeting rooms Focus acoustics
Office fit out JLT Dubai video thumbnail
Click to play

JLT offices often need a balance between openness and privacy. This fit out used partitions, meeting pods, and better lighting layers to support focus without making the space feel tight.

JLT office reception
JLT office workstations
JLT meeting room
JLT office partitions
JLT office reception repeat

DIFC Client Lounge Upgrade

Area DIFC Scope finishes and lighting Focus brand feel
Office renovation DIFC Dubai video thumbnail
Click to play

In DIFC, the client experience matters as much as function. This upgrade focused on finishes, lighting, and meeting room comfort while keeping compliance and site rules simple.

DIFC office lounge
DIFC office ceiling detail
DIFC office lighting
DIFC office partitions
DIFC office lounge repeat

Downtown Boardroom Makeover

Area Downtown Dubai Scope boardroom and AV Focus clean handover
Office makeover Downtown Dubai video thumbnail
Click to play

Boardrooms fail when power, data, display, acoustics, and lighting do not align. This makeover fixed the coordination first, then finishes, then final snag and handover checks.

Downtown office meeting area
Downtown office workstations
Downtown office partitions
Downtown office lighting detail
Downtown office meeting area repeat

Al Quoz Studio Office Fit Out

Area Al Quoz Scope studio and storage Focus practical flow

Studio offices often need storage, clean power routes, and durable finishes. This type of fit out stays smooth when the scope is written clearly and procurement is confirmed before site start.

Al Quoz office storage and joinery
Al Quoz office workspace
Al Quoz office partitions detail
Al Quoz office flooring detail
Al Quoz office storage repeat

Revive Hub workflow for office fit out

From photo upload to architect led 3D planning, scope freeze, approvals guidance, and staged execution. The aim is simple: clarify the design first so there are no surprises on site.

What you share

1
Upload photos or quick walkthrough Mobile photos plus a short video, or a PDF layout if available. Reception, workstations, pantry, washroom, and ceiling shots are helpful.
2
Business needs Headcount, meeting rooms count, departments, storage, server corner, client area, brand feel, timeline target.
3
Building rules and constraints Working hours, delivery slots, management guidelines, and if you have an NOC document template, share it.
Photos Layout Headcount Timeline

What you receive before execution

1
Architect prepared 3D preview Workstations zoning, meeting rooms, reception flow, partitions direction, lighting mood, and practical circulation.
2
Revision loop before commitment Design revisions based on your feedback so both the layout and the look and feel are locked in.
3
Scope freeze pack Written scope, finishes shortlist, partitions plan, a points map, and an execution sequence so procurement does not run late.
First See Then Pay mindset Get clarity in 3D first, then lock the scope, then execute on site. This reduces the risk of delays and rework.

Step by step delivery workflow

1
Discovery and requirements Clarity in 3D first, then scope lock, then site execution. This reduces the risk of delays and rework.
2
3D concept by architects Space planning, partitions zoning, circulation, reception and meeting layout, initial look and feel.
3
MEP and IT points alignment Power, data, AC diffuser direction, and lighting logic. This step prevents delays.
4
Design revisions and scope lock Feedback based changes, then final scope freeze so ordering is safe.
5
Approvals and NOC guidance Building management required documents, access plan, work permits, and an inspection lane where applicable.
6
Procurement and scheduling Plan long lead items early, align deliveries with building time windows, and keep the manpower plan ready.
7
Execution in clean stages Site protection, demolition if any, partitions, MEP, ceiling and lighting, flooring, painting, joinery, final detailing.
8
Snag and handover Snag list close, cleaning, key documents pack, and practical handover checklist.
Most important rule The earlier you lock the layout and points map, the more predictable the cost and timeline become.
This workflow is general guidance and steps may change based on building rules and location.

Quick answers people ask before an office fit out in Dubai

These questions decide budget, timeline, approvals, and location choices. The goal is clarity so execution stays smooth.

How much does office fit out cost in Dubai?+
Cost depends on office size, scope level, the amount of MEP and IT work, partition type, and how many authority approvals are needed. Use the price guide below as a starting point, then confirm after a site check and scope freeze.
How much does a fit out cost per square metre in Dubai?+
A practical way is to estimate per sqm based on scope tier. Budget fit outs focus on essentials, standard focuses on productivity and branding, premium focuses on detail and comfort. Exact numbers vary by building rules and finishes, so treat ranges as indicative only.
What is an office fit out project?+
An office fit out is the process of converting a shell or existing space into a functional workplace. It includes layout planning, partitions, flooring, ceilings, lighting, MEP, data and AV points, pantry and washroom adjustments, and final handover checks.
What is the difference between a fit out and a renovation?+
Fit out usually means building the workplace elements from base condition or changing the internal layout and services. Renovation often means refreshing an existing finished office such as repainting, flooring changes, lighting upgrades, and selective joinery without major layout changes.
How to plan an office renovation?+
Start with team headcount, meeting room needs, storage, and workflow. Then confirm power and data points, AC and ventilation, and fire safety rules. After that, select finishes that match wear level and cleaning needs. A 3D preview helps align decisions before ordering.
How to get initial approval in Dubai?+
Initial approval commonly starts with landlord and building management NOC, then fit out permit requirements based on your location and authority. Some buildings also require fire safety review for layout changes. The approvals section below shows a practical checklist and what documents usually help.
What are the root causes of construction project delays in Dubai?+
Most delays come from late approvals, missing drawings, scope changes after procurement, long lead materials, MEP clashes discovered during execution, and inspection booking delays. The process section includes a delay prevention table you can use as a checklist.
Which Dubai areas offer the cheapest office rentals?+
Rental cost changes frequently, but budget friendly choices are often older commercial zones and practical business corridors where fit out rules are simpler. Use the rental guide table below to compare tradeoffs like parking, access, and building rules.
Which is the best company to work for in Dubai?+
It depends on industry, role, and benefits. From a workplace perspective, the best companies usually invest in clear workflows, healthy lighting, comfortable meeting areas, and quiet focus zones. A well planned fit out can support productivity and retention without overspending.

Office fit out services

Core fit out scopes

Space planningHeadcount mapping, meeting room mix, circulation, storage, reception flow
PartitionsGlass, gypsum, acoustic options, meeting rooms, manager cabins
Ceilings and lightingWorkplace lighting layers, energy minded selections, clean installation
Flooring and finishesDurability based material choices, easy maintenance, clean edges

MEP and compliance coordination

Electrical and dataPower points, data points, AV, server corner planning, load checks
HVAC and ventilationAir flow comfort, diffusers alignment, heat load awareness
Pantry and washroom worksPlumbing corrections, finishes, water management, testing
Handover checklistSnag list, cleaning, documented scope, practical sign off

How to plan an office fit out in Dubai without chaos

Step by step

Step 1Share photos or layout, headcount, departments, meeting needs, timeline goal
Step 23D preview plus written scope so the layout and points are visible
Step 3Freeze scope and confirm revisions before ordering
Step 4Approval plan, NOC documents, work permits, access timing
Step 5Execution in stages, inspections if needed, snag and handover checklist
Simple rule The earlier you lock layout, MEP points, and partition plan, the fewer delays you will face later.
Planning steps are general and may vary by building rules, landlord requirements, and authority jurisdiction.

Root causes of delays and how to prevent them

Most Dubai delays are predictable when you track approvals, drawings, procurement, and inspections as separate lanes.

Delay cause Why it happens How to prevent it
Approvals not started early NOC and permit steps begin after site start planning Collect NOC documents and drawings before procurement
Scope changes after ordering Layout moves after partitions, flooring, or joinery are booked Freeze scope using 3D preview and written scope
MEP clashes found on site Power, data, AC routes conflict with partitions and ceilings Coordinate drawings and points map before ceiling close
Long lead materials Special finishes, glass, joinery, lighting arrive late Confirm lead times early and choose alternatives if needed
Access timing Building allows work only in certain hours and loading rules Align permits, deliveries, and manpower with access windows
Red flag If a plan does not show power and data points clearly, delays usually appear later when teams discover missing outlets and routes.
This is a practical checklist, not a legal or authority document.

Office rental guide for budget planning

Rent and fit out should be planned together. A cheaper rent can still become expensive if rules are strict, access is limited, or the base building condition forces extra MEP work.

Zone style Areas often considered Why it can feel cheaper Common tradeoffs
Budget practical Deira, Al Karama, Al Qusais Older stock, flexible unit sizes Parking, older services, building rules vary
Value business hubs Dubai Silicon Oasis, JLT, Al Quoz Mixed options, many fitted units exist Commute patterns, access windows, fit out approvals differ
Premium addresses Business Bay, Downtown, DIFC Brand value, client proximity Higher rent, tighter building controls, stricter approvals
Tip Before signing, ask for building fit out guidelines, NOC steps, and allowed working hours. That one document can save weeks.
Area examples are general guidance and market conditions change.

Office fit out Dubai price guide

Approximate estimates in AED. Final cost depends on site condition, MEP and IT points, approvals, materials, and scope freeze. 1 sqm is about 10.76 sq ft.

Scope level Typical inclusions Approx range per sqm When it fits best
Essential fit out Basic partitions, paint, lights, flooring, essential power and data AED 650 to 950 per sqm When you need a clean functional workspace fast
Standard fit out Meeting rooms, reception touch, better lighting, more IT points, acoustic improvements AED 950 to 1450 per sqm When you want productivity plus a clear brand feel
Premium fit out High spec finishes, custom joinery, feature ceilings, stronger acoustic detail, AV readiness AED 1450 to 2200 per sqm When client facing areas and comfort matter most
High detail corporate Extensive joinery, premium materials, complex MEP and IT, special lighting and detailing AED 2200 plus per sqm When the office is a flagship brand space
Cost driver What increases cost How to control it
Partitions More meeting rooms, acoustic specs, special glass, door hardware Lock layout and room count early
MEP and HVAC Relocating diffusers, extra power load, new routes, extra points Create a points map before ceiling close
IT and AV Server corner, structured cabling, boardroom AV coordination Decide AV locations before partitions finish
Finishes Premium flooring, feature walls, custom joinery, designer lighting Choose durable finishes with clean lead times
Approvals Layout change approvals, fire safety reviews, inspections scheduling Start approvals early with correct drawings
Cost safety tip The fastest cost increase comes from changing scope mid fit out. A 3D preview plus written scope reduces rework.
Estimates are indicative only and can vary by building rules, authority jurisdiction, and material availability.

Approvals checklist for office fit out in Dubai

Common approval paths

Landlord and building management NOCWork method, drawings, contractor details, timing rules, access and loading policy
Fit out permit requirementsDepends on location and authority, some areas have additional fit out guidelines
Fire safety and life safety checksFor layout changes and certain works, a review and inspection lane may apply

Before mobilization

Scope freezeLayout, meeting rooms count, partitions, MEP and IT points, finish list
Documents packLayout drawings, material notes, method statement, contractor details if requested
Access planWork hours, lift booking, waste movement path, protection and noise controls
Approval item Who issues When it is needed What usually helps
Building management NOC Building management Before any site start Layout drawing, work method, timing plan, contractor details
Landlord NOC Landlord or property owner Before layout changes and major works Scope summary, drawings, reinstatement understanding
Fit out permit lane Authority or community management depending on location When required by your zone rules Drawing set, material notes, consultant requirements if any
Fire safety review lane Life safety reviewer where applicable For certain layout changes and compliance checks Clear layout, egress awareness, points map, ceiling plan
Work permits and access Building management For after hours works and deliveries Manpower plan, delivery slots, protection plan, noise plan
Practical approach Start approvals with the cleanest version of drawings. Revisions are normal, but late revisions after procurement usually create delays.
This checklist is general guidance and each building may have different rules.

Areas we serve for office fit out in Dubai

Office fit out and office renovation projects across major business areas, subject to building rules and access windows.

Business BayFast paced towers, approvals clarity matters
DIFCClient facing detail and compliance awareness
Downtown DubaiBoardroom and reception upgrades
Jumeirah Lake TowersMeeting room mix and acoustic comfort
Dubai Silicon OasisPractical layouts, points planning first
Al QuozStudio offices, durable finishes and storage

Client experiences

Ansar Zameer

I’ve got multiple offices across Dubai, but when I recently hired Revive Hub Renovations Dubai to renovate my workspace in Business Bay, the experience blew me away. I was worried about the permissions, especially the NOC from the building management and the Dubai Municipality and fire safety approvals that always slow things down. What stood out: they told me upfront you don’t pay until you’re fully satisfied with the design, and even before we’d signed anything they gave two free design revisions based on my feedback. And they handled the approval process for me, from building management NOC to the municipality paperwork so I didn’t have to chase anything. The final space in Business Bay looks professional, clean, and exactly how I pictured it. Rare to find this kind of honesty plus dedication these days. Highly recommended for anyone who wants a smooth, compliance safe office renovation.

Google verified
Mezi Butt

I’m based in Dubai Silicon Oasis, and I’ve dealt with a few renovation companies before, most of them either respond late or surprise you with hidden charges at the end. So I started this project with a bit of hesitation. Revive Hub actually surprised me in a good way. They sent the first 3D preview on the same day, which was way faster than anything I’ve seen from companies around JVC and nearby areas. It felt like they were genuinely paying attention instead of recycling some template design. The second revision took a little more time, and for a moment I thought the process might slow down, but once I saw the final version, it felt worth the wait. They followed every detail I mentioned without trying to upsell anything or add weird extra costs. What I appreciated most was how simple, transparent, and honest everything felt. No last minute surprises, no hidden add ons, just a clean and straightforward experience.

Google verified
Office renovation and fit out guide
Read the step by step office renovation guide before you spend
If you want fewer delays, fewer scope changes, and more predictable cost, start with the guide. It explains planning flow, approvals thinking, and the points map logic that prevents rework.
Know the right sequence Layout, points map, approvals lane, procurement lane, then execution
Reduce timeline risk Approvals and access rules decide start dates more than paint and flooring
Lock scope before ordering The biggest cost jumps happen after partitions and MEP changes start
Guide Approvals Points map Scope freeze
Open the guide or start in WhatsApp
Choose one action. If you already have photos or layout, upload them and we can suggest scope tier quickly.
Fast clarity rule If layout and points are clear in 3D, cost and timeline become predictable.

Office fit out FAQs

Do you start with 3D preview before major work begins?+
A 3D preview makes layout, partitions, and key points visible. This helps align decisions early so the scope can be written clearly before procurement and site start.
How do you keep fit out cost predictable?+
Cost stays predictable when layout is frozen, MEP and IT points are confirmed, and finish specs are written. The biggest overruns usually come from late scope changes after ordering.
Can office works be done after hours?+
Many buildings allow after hours work with a permit and access plan. Confirm work hours, lift booking, noise rules, and delivery timing before scheduling.
What documents should a tenant keep after handover?+
Keep the written scope, layout drawings, points map, approvals confirmations if applicable, snag list sign off, and warranty documentation for key items and workmanship.
How do approvals affect timeline for office fit out?+
Approvals can move start dates and inspections. The safest approach is to start NOC steps early with clear drawings and align procurement with permit timing.
What is the fastest way to avoid project delays?+
Freeze scope, confirm MEP and IT points, book approvals early, and avoid ordering long lead items late. A short weekly plan for approvals, procurement, and site tasks keeps the project on track.
Find us on Google
Mon to Sat 9 AM to 8 PM   |   +971 58 662 2311

Office Fit Out Dubai   Partitions   MEP and IT   Approvals support   Handover checklist
Clear scope   3D preview   approvals guidance   staged delivery
© 2026 Revive Hub. All rights reserved.
Book Now
“`