Workspace planning, partitions, MEP and IT coordination, approvals support, and a 3D preview so the scope is clear before major work starts.
3D preview before commitment
Design revisions before start
NOC and approvals guidance
Handover checklist
First See Then Pay for office fit out
Share your office photos or layout and receive a clear 3D concept plus a practical scope. This helps freeze decisions early, reduce delays, and keep costs predictable.
Area Business BayScope partitions and workstationsFocus NOC flow
Click to play
A Business Bay fit out where schedule stayed stable by freezing drawings early and aligning building management NOC, work permits, and site access windows before ordering materials.
★ Dubai Silicon Oasis Office Renovation
Area Dubai Silicon OasisScope flooring and ceilingFocus fast 3D clarity
Click to play
A Silicon Oasis project where cost stayed controlled by keeping MEP changes minimal and confirming power, data points, and lighting plan before final finishes.
★ JLT Modern Workspace Fit Out
Area Jumeirah Lake TowersScope glass and meeting roomsFocus acoustics
Click to play
JLT offices often need a balance between openness and privacy. This fit out used partitions, meeting pods, and better lighting layers to support focus without making the space feel tight.
★ DIFC Client Lounge Upgrade
Area DIFCScope finishes and lightingFocus brand feel
Click to play
In DIFC, the client experience matters as much as function. This upgrade focused on finishes, lighting, and meeting room comfort while keeping compliance and site rules simple.
★ Downtown Boardroom Makeover
Area Downtown DubaiScope boardroom and AVFocus clean handover
Click to play
Boardrooms fail when power, data, display, acoustics, and lighting do not align. This makeover fixed the coordination first, then finishes, then final snag and handover checks.
★ Al Quoz Studio Office Fit Out
Area Al QuozScope studio and storageFocus practical flow
Studio offices often need storage, clean power routes, and durable finishes. This type of fit out stays smooth when the scope is written clearly and procurement is confirmed before site start.
Revive Hub workflow for office fit out
From photo upload to architect led 3D planning, scope freeze, approvals guidance, and staged execution. The aim is simple: clarify the design first so there are no surprises on site.
What you share
1
Upload photos or quick walkthroughMobile photos plus a short video, or a PDF layout if available. Reception, workstations, pantry, washroom, and ceiling shots are helpful.
2
Business needsHeadcount, meeting rooms count, departments, storage, server corner, client area, brand feel, timeline target.
3
Building rules and constraintsWorking hours, delivery slots, management guidelines, and if you have an NOC document template, share it.
PhotosLayoutHeadcountTimeline
What you receive before execution
1
Architect prepared 3D previewWorkstations zoning, meeting rooms, reception flow, partitions direction, lighting mood, and practical circulation.
2
Revision loop before commitmentDesign revisions based on your feedback so both the layout and the look and feel are locked in.
3
Scope freeze packWritten scope, finishes shortlist, partitions plan, a points map, and an execution sequence so procurement does not run late.
First See Then Pay mindset Get clarity in 3D first, then lock the scope, then execute on site. This reduces the risk of delays and rework.
Step by step delivery workflow
1
Discovery and requirementsClarity in 3D first, then scope lock, then site execution. This reduces the risk of delays and rework.
2
3D concept by architectsSpace planning, partitions zoning, circulation, reception and meeting layout, initial look and feel.
3
MEP and IT points alignmentPower, data, AC diffuser direction, and lighting logic. This step prevents delays.
4
Design revisions and scope lockFeedback based changes, then final scope freeze so ordering is safe.
5
Approvals and NOC guidanceBuilding management required documents, access plan, work permits, and an inspection lane where applicable.
6
Procurement and schedulingPlan long lead items early, align deliveries with building time windows, and keep the manpower plan ready.
7
Execution in clean stagesSite protection, demolition if any, partitions, MEP, ceiling and lighting, flooring, painting, joinery, final detailing.
8
Snag and handoverSnag list close, cleaning, key documents pack, and practical handover checklist.
Most important rule The earlier you lock the layout and points map, the more predictable the cost and timeline become.
This workflow is general guidance and steps may change based on building rules and location.
Quick answers people ask before an office fit out in Dubai
These questions decide budget, timeline, approvals, and location choices. The goal is clarity so execution stays smooth.
How much does office fit out cost in Dubai?+
Cost depends on office size, scope level, the amount of MEP and IT work, partition type, and how many authority approvals are needed. Use the price guide below as a starting point, then confirm after a site check and scope freeze.
How much does a fit out cost per square metre in Dubai?+
A practical way is to estimate per sqm based on scope tier. Budget fit outs focus on essentials, standard focuses on productivity and branding, premium focuses on detail and comfort. Exact numbers vary by building rules and finishes, so treat ranges as indicative only.
What is an office fit out project?+
An office fit out is the process of converting a shell or existing space into a functional workplace. It includes layout planning, partitions, flooring, ceilings, lighting, MEP, data and AV points, pantry and washroom adjustments, and final handover checks.
What is the difference between a fit out and a renovation?+
Fit out usually means building the workplace elements from base condition or changing the internal layout and services. Renovation often means refreshing an existing finished office such as repainting, flooring changes, lighting upgrades, and selective joinery without major layout changes.
How to plan an office renovation?+
Start with team headcount, meeting room needs, storage, and workflow. Then confirm power and data points, AC and ventilation, and fire safety rules. After that, select finishes that match wear level and cleaning needs. A 3D preview helps align decisions before ordering.
How to get initial approval in Dubai?+
Initial approval commonly starts with landlord and building management NOC, then fit out permit requirements based on your location and authority. Some buildings also require fire safety review for layout changes. The approvals section below shows a practical checklist and what documents usually help.
What are the root causes of construction project delays in Dubai?+
Most delays come from late approvals, missing drawings, scope changes after procurement, long lead materials, MEP clashes discovered during execution, and inspection booking delays. The process section includes a delay prevention table you can use as a checklist.
Which Dubai areas offer the cheapest office rentals?+
Rental cost changes frequently, but budget friendly choices are often older commercial zones and practical business corridors where fit out rules are simpler. Use the rental guide table below to compare tradeoffs like parking, access, and building rules.
Which is the best company to work for in Dubai?+
It depends on industry, role, and benefits. From a workplace perspective, the best companies usually invest in clear workflows, healthy lighting, comfortable meeting areas, and quiet focus zones. A well planned fit out can support productivity and retention without overspending.
Office fit out services
Core fit out scopes
Space planningHeadcount mapping, meeting room mix, circulation, storage, reception flow
Step 23D preview plus written scope so the layout and points are visible
Step 3Freeze scope and confirm revisions before ordering
Step 4Approval plan, NOC documents, work permits, access timing
Step 5Execution in stages, inspections if needed, snag and handover checklist
Simple rule The earlier you lock layout, MEP points, and partition plan, the fewer delays you will face later.
Planning steps are general and may vary by building rules, landlord requirements, and authority jurisdiction.
Root causes of delays and how to prevent them
Most Dubai delays are predictable when you track approvals, drawings, procurement, and inspections as separate lanes.
Delay cause
Why it happens
How to prevent it
Approvals not started early
NOC and permit steps begin after site start planning
Collect NOC documents and drawings before procurement
Scope changes after ordering
Layout moves after partitions, flooring, or joinery are booked
Freeze scope using 3D preview and written scope
MEP clashes found on site
Power, data, AC routes conflict with partitions and ceilings
Coordinate drawings and points map before ceiling close
Long lead materials
Special finishes, glass, joinery, lighting arrive late
Confirm lead times early and choose alternatives if needed
Access timing
Building allows work only in certain hours and loading rules
Align permits, deliveries, and manpower with access windows
Red flag If a plan does not show power and data points clearly, delays usually appear later when teams discover missing outlets and routes.
This is a practical checklist, not a legal or authority document.
Office rental guide for budget planning
Rent and fit out should be planned together. A cheaper rent can still become expensive if rules are strict, access is limited, or the base building condition forces extra MEP work.
Zone style
Areas often considered
Why it can feel cheaper
Common tradeoffs
Budget practical
Deira, Al Karama, Al Qusais
Older stock, flexible unit sizes
Parking, older services, building rules vary
Value business hubs
Dubai Silicon Oasis, JLT, Al Quoz
Mixed options, many fitted units exist
Commute patterns, access windows, fit out approvals differ
Premium addresses
Business Bay, Downtown, DIFC
Brand value, client proximity
Higher rent, tighter building controls, stricter approvals
Tip Before signing, ask for building fit out guidelines, NOC steps, and allowed working hours. That one document can save weeks.
Area examples are general guidance and market conditions change.
Office fit out Dubai price guide
Approximate estimates in AED. Final cost depends on site condition, MEP and IT points, approvals, materials, and scope freeze. 1 sqm is about 10.76 sq ft.
Scope level
Typical inclusions
Approx range per sqm
When it fits best
Essential fit out
Basic partitions, paint, lights, flooring, essential power and data
AED 650 to 950 per sqm
When you need a clean functional workspace fast
Standard fit out
Meeting rooms, reception touch, better lighting, more IT points, acoustic improvements
AED 950 to 1450 per sqm
When you want productivity plus a clear brand feel
Premium fit out
High spec finishes, custom joinery, feature ceilings, stronger acoustic detail, AV readiness
AED 1450 to 2200 per sqm
When client facing areas and comfort matter most
High detail corporate
Extensive joinery, premium materials, complex MEP and IT, special lighting and detailing
AED 2200 plus per sqm
When the office is a flagship brand space
Cost driver
What increases cost
How to control it
Partitions
More meeting rooms, acoustic specs, special glass, door hardware
Lock layout and room count early
MEP and HVAC
Relocating diffusers, extra power load, new routes, extra points
Create a points map before ceiling close
IT and AV
Server corner, structured cabling, boardroom AV coordination
Authority or community management depending on location
When required by your zone rules
Drawing set, material notes, consultant requirements if any
Fire safety review lane
Life safety reviewer where applicable
For certain layout changes and compliance checks
Clear layout, egress awareness, points map, ceiling plan
Work permits and access
Building management
For after hours works and deliveries
Manpower plan, delivery slots, protection plan, noise plan
Practical approach Start approvals with the cleanest version of drawings. Revisions are normal, but late revisions after procurement usually create delays.
This checklist is general guidance and each building may have different rules.
Areas we serve for office fit out in Dubai
Office fit out and office renovation projects across major business areas, subject to building rules and access windows.
Business BayFast paced towers, approvals clarity matters
DIFCClient facing detail and compliance awareness
Downtown DubaiBoardroom and reception upgrades
Jumeirah Lake TowersMeeting room mix and acoustic comfort
Dubai Silicon OasisPractical layouts, points planning first
Al QuozStudio offices, durable finishes and storage
Client experiences
Ansar Zameer
I’ve got multiple offices across Dubai, but when I recently hired Revive Hub Renovations Dubai to renovate my workspace in Business Bay, the experience blew me away. I was worried about the permissions, especially the NOC from the building management and the Dubai Municipality and fire safety approvals that always slow things down. What stood out: they told me upfront you don’t pay until you’re fully satisfied with the design, and even before we’d signed anything they gave two free design revisions based on my feedback. And they handled the approval process for me, from building management NOC to the municipality paperwork so I didn’t have to chase anything. The final space in Business Bay looks professional, clean, and exactly how I pictured it. Rare to find this kind of honesty plus dedication these days. Highly recommended for anyone who wants a smooth, compliance safe office renovation.
Google verified
Mezi Butt
I’m based in Dubai Silicon Oasis, and I’ve dealt with a few renovation companies before, most of them either respond late or surprise you with hidden charges at the end. So I started this project with a bit of hesitation. Revive Hub actually surprised me in a good way. They sent the first 3D preview on the same day, which was way faster than anything I’ve seen from companies around JVC and nearby areas. It felt like they were genuinely paying attention instead of recycling some template design. The second revision took a little more time, and for a moment I thought the process might slow down, but once I saw the final version, it felt worth the wait. They followed every detail I mentioned without trying to upsell anything or add weird extra costs. What I appreciated most was how simple, transparent, and honest everything felt. No last minute surprises, no hidden add ons, just a clean and straightforward experience.
Google verified
✨Office renovation and fit out guide
Read the step by step office renovation guide before you spend
If you want fewer delays, fewer scope changes, and more predictable cost, start with the guide.
It explains planning flow, approvals thinking, and the points map logic that prevents rework.
Know the right sequenceLayout, points map, approvals lane, procurement lane, then execution
Reduce timeline riskApprovals and access rules decide start dates more than paint and flooring
Lock scope before orderingThe biggest cost jumps happen after partitions and MEP changes start
GuideApprovalsPoints mapScope freeze
Open the guide or start in WhatsApp
Choose one action. If you already have photos or layout, upload them and we can suggest scope tier quickly.
Fast clarity rule If layout and points are clear in 3D, cost and timeline become predictable.
Office fit out FAQs
Do you start with 3D preview before major work begins?+
A 3D preview makes layout, partitions, and key points visible. This helps align decisions early so the scope can be written clearly before procurement and site start.
How do you keep fit out cost predictable?+
Cost stays predictable when layout is frozen, MEP and IT points are confirmed, and finish specs are written. The biggest overruns usually come from late scope changes after ordering.
Can office works be done after hours?+
Many buildings allow after hours work with a permit and access plan. Confirm work hours, lift booking, noise rules, and delivery timing before scheduling.
What documents should a tenant keep after handover?+
Keep the written scope, layout drawings, points map, approvals confirmations if applicable, snag list sign off, and warranty documentation for key items and workmanship.
How do approvals affect timeline for office fit out?+
Approvals can move start dates and inspections. The safest approach is to start NOC steps early with clear drawings and align procurement with permit timing.
What is the fastest way to avoid project delays?+
Freeze scope, confirm MEP and IT points, book approvals early, and avoid ordering long lead items late. A short weekly plan for approvals, procurement, and site tasks keeps the project on track.